[FREE TICKET] Register for SEMICON WEST 2020

Share This Post

REGISTER NOW FOR FREE PASS

INAC US is virtually exhibiting at SEMICON WEST 2020 from July 20-23, 2020.

 

2020 Marks SEMI’s 50th Anniversary.

The digital platform will gather microelectronics manufacturing and design professionals from around the globe, and offer the full-featured experiences you’ve come to expect.

 

Free Expo Pass includes access to:
  • Exhibit Hall
  • SMART Pavilions
  • Networking Rooms
  • Partner Program: SOI Consortium

 

Click HERE to register for a complimentary EXPO pass or All-In pass at a discounted rate. We look forward to seeing you at our virtual booth!

Subscribe To Our Newsletter

Get updates and learn from the best

More To Explore ...

STEP5: Quality Assurance and Precision Inspection

A quality inspection is performed. At INAC, where quality comes first, we use CMMs, gauges, and other equipment for precision checks.

STEP4: Post-Processing and Finishing

Finishing is done by removing the supports, polishing, and applying transparency treatment. It is also possible to paint and apply plating to the formed product.

STEP3: UV-Laser Print Formation (SLA Process)

Output: The product is formed by irradiating the liquid with a laser beam of UV light and laminating it. The conditions of the external environment, such as room temperature and humidity, must be maintained.

STEP2: Model Program Generation and Support Adjustment

A program for model formation is created. Depending on the shape, it may be necessary to adjust the degree of tilt and the position of the supports.

STEP1: CAD File Submission

Upload your CAD to our online quoting platform.

STEP 3: Rendering and Scene Integration

We can also handle exterior modeling and interior structure design based on illustrations. After creating the 3D models, we can create a rendering to fit a scene. We can deliver images even if we do not proceed with production.

STEP 2: Detailed Design and 3D Modeling

Once the design is determined, drawings and 3D models will be created. The structure will be examined, taking into consideration not only the external design but also functionalities such as mating and sliding.

STEP 1: Initial Design Consultation

The first step is a meeting to discuss the project. Drawings are not required for this meeting. We will create a design from a sketch based on the overall image and concept that you have in mind.

STEP5: Quality Assurance and Inspection

We perform quality inspections. At INAC, where quality comes first, we use CMMs, gauges, and other equipment for precision checks.

STEP4: Post-Casting Finishing

Vacuum casting materials are cured and then taken out of the silicone rubber mold. Then we perform finishing such as deburring and gating, and they are made into finish products.

STEP3:Material Injuction

Liquid casting material is injected into the silicone rubber mold in a vacuum environment. 

STEP2: Mold Preparation

The silicone mold is cut open into a male and female mold, and the master model is removed.

STEP1: Mold Creation

The master model is fixed to a wooden frame and silicone is poured to create a mold.